It was suggested that a risk-b...

image description
image description
image description
image description
image description
image description
image description
- In Social Interaction    1

It was suggested that a risk-based plan should be planned for the control work.

It was suggested that a risk-based plan should be planned for the control work.
-------------------------
August 13/2017
The Directorate of Health Institutions and Professionals Supervision of the Addis Ababa Food and Drug Authority held a joint discussion with the directorates of the sector from the center to the branches on the preparation of the 2018 budget year plan and the preparation of a new checklist for the control of traditional medicine institutions.

At the forum, the Deputy General Manager of the Authority's Control Sector, Ato Enga Erekta, stated that a risk-based plan should be planned for the 2018 budget year by classifying pharmacies and health institutions in stages, and technical supervision and support should be part of the plan. To fill the gaps in regulatory skills, they provided guidelines and directions that should be included in the plan in a manner that would allow for capacity building training and accountability for those who do not change ethical issues, as well as in a manner that would allow for the identification of the actual problems faced by traditional medical institutions.

On his part, the Director of the Authority's Health Institutions and Professionals Supervision Directorate, Ato Gelgelo Oljra, provided a comprehensive explanation and explanation based on practical and theoretical principles on how and in what manner a risk-based plan should be planned.

Participants also discussed the presented guidelines and guidelines and reached a consensus that they would plan the plan in accordance with the given direction.


Comments

Nothing was found.

Leave Your Comments